Tokamak Cooling Water System (TCWS) Pre-Fabrication and Installation

Type

Forthcoming tender

Research Facility

ITER

The scope of Works consists of approximately 9000 linear meters of pipes to be pre-fabricated and installed as part of the Tokamak Cooling Water System (most of the pipes will be double walled).
External link to procurement, here