TCWS Pre-Fabrication and Installation
Opening date
October 28, 2024
Closing date
November 18, 2024
Type
Quote
Research Facility
ITER
The scope of Works consists of approximately 9000 linear meters of pipes to be pre-fabricated and installed as part of the Tokamak Cooling Water System (most of the pipes will be double walled).
External link to procurement, here