Replacement of the “Optic lab” air handling system
Opening date
August 18, 2021
Closing date
September 15, 2021
Type
Propose suppliers
Research Facility
ESRF
Dismantling and disposal of the existing system (Electrical cubicle, Air handling unit, ducts, pipes). Supply and installation of a new air treatment system for Optical laboratory. The installation must guarantee a temporal thermal stability. The installation of the air treatment system in this room is meant to control the temperature at 23°C ± 0,1°C, the hygrometry at 50%, and dust accumulation in specific environment ( ISO 6 classification – standard ISO 14644-1). The works shall be carried out by a company specialized in HVAC (Heating, Ventilation, Air Conditioning) Engineering and in the installation of sensitive equipment. The company shall have an after-sales service in France to intervene within 48 hours during the 2-year warrantee Note for the manpower part: companies based outside France are subject to French Law on "Temporary posting of workers in France" (available on our e-bidding platform).