Replacement of the “Optic lab” air handling system

Opening date

August 18, 2021

Closing date

September 15, 2021

Type

Propose suppliers

Research Facility

ESRF

Dismantling and disposal of the existing system (Electrical cubicle, Air handling unit, ducts, pipes). Supply and installation of a new air treatment system for Optical laboratory. The installation must guarantee a temporal thermal stability. The installation of the air treatment system in this room is meant to control the temperature at 23°C ± 0,1°C, the hygrometry at 50%, and dust accumulation in specific environment ( ISO 6 classification – standard ISO 14644-1). The works shall be carried out by a company specialized in HVAC (Heating, Ventilation, Air Conditioning) Engineering and in the installation of sensitive equipment. The company shall have an after-sales service in France to intervene within 48 hours during the 2-year warrantee Note for the manpower part: companies based outside France are subject to French Law on "Temporary posting of workers in France" (available on our e-bidding platform).

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95