PR122464-MRI Supply of Sylodamp material for M1 Segment Assembly Transport Containers (HQ Garching)
Opening date
February 8, 2024
Closing date
February 22, 2024
Type
Propose suppliers
Research Facility
ESO
As an additional safety precaution, blocks of Sylodamp SP 100 will be entered into the wire dampers of the suspension system of the transport containers for the Mirror Segments of the Extremely Large Telescope’s primary mirror. Figure 1 shows an example (with a different material, and in this case composed of 3 layers of foam).
The scope of this contract consists in the production and delivery of 1452 blocks of Sylodamp SP 100 of the required dimensions.