Market Survey on Design and Manufacturing of Tritium Systems of the ITER Test Blanket System (TBS)
Opening date
February 16, 2024
Closing date
March 29, 2024
Type
Market Survey
Research Facility
Fusion for Energy
The scope of delivery is based on a Preliminary Design approved by IO and provided by F4E to the Supplier. The provisional scope of the contract includes: • Preparation of the Final Design • Execution of the Final Design Review (FDR) with the participation of Experts from F4E, ITER Organization and external experts; • Production of manufacturing drawings and plans; • Execution of the Manufacturing Readiness Review (MRR) with the participation of Experts from F4E, ITER Organization and external experts; • Manufacturing and procurement of all components, including sensors and I&C system; • Factory testing and delivery to ITER Site at Cadarache (F); • Option: On Site Assistance to IO during Installation and Commissioning.
Market Survey: https://ec.europa.eu/eusurvey/runner/TBM_Ancillary_Systems_TES_TAS_Gloveboxes
External link to procurement, here