IT-4891/SCE - Supply and installation of HVAC installations, for a new centralised heating plant on the Meyrin site
Opening date
July 22, 2024
Closing date
September 19, 2024
Type
Quote
Research Facility
CERN
The general description of the Works covered by this Invitation to Tender is as follows: - - - - - - - - - - - - Supply and installation of a heat pump (HP) to recover heat from the CERN accelerators complex at the Point 1; Supply and installation of all hydraulic equipment, pumps, valves, filters, etc; Carrying out all piping and insulation works; Supply and installation of electrical power panels; Supply and installation of electrical control/automation panels; Carrying out all the wiring and power supply works for the substation equipment; Carrying out hygienic air ventilation and emergency ventilation works; Supply and installation of complete regulation of all elements of the Heating plant, including the automation system of the existing boiler room 201; Hydraulic and electrical connection works to the existing boiler room; Carrying out all cabling and power supply work for building services; Carrying out all indoor lighting work; Sanitary works.