IT-4661/EP/ATLAS - Supply of Regulated Extra-low, Low and High Voltage Power Supplies for the Phase 2 ATLAS Muon Spectrometer

Opening date

July 27, 2022

Closing date

September 11, 2022

Type

Forthcoming tender

Research Facility

CERN

This Technical Specification concerns the supply and maintenance of regulated Extra-low (ELV)1, Low (LV)2 and High (HV)3 Voltage DC Power Supplies of the ATLAS Muon Spectrometer, necessary to power its detectors and front-end/read-out electronics. These power supplies will be installed during the LHC Long Shutdown 3 (2026 – 2028) and beyond (up to 2030). The contracts will be awarded in three separate lots:  Lot 1 – Monitored Drift Tubes (MDT) and Small Monitored Drift Tubes (sMDT) ELV, LV and HV power supplies, and Small Thin Gap Chambers (sTGC) HV power supplies;  Lot 2 – Thin Gap Chambers (TGC) ELV, LV and HV power supplies;  Lot 3 – Legacy Resistive Plate Counters (RPC) and Barrel Inner (BI) RPC ELV, LV and HV power supplies.

More information

If you require any further information, feel free to contact me.

Håkan Nilsson

Business Developer & Project Manager

hakan.nilsson@bigsciencesweden.se

+46 70 58 52 905