H15 tunnel - Steel parts

Opening date

April 3, 2022

Closing date

May 22, 2022

Type

Propose suppliers

Research Facility

ILL

The protection considered is a four faces tunnel composed with steel or lead+ PEHD depending of the location. The total weight is around 300 tons The total length is around 50 meters A very simple design was considered, raw plates welded together to compose sides and “roof”, single plate for the “floor”- screwed together to obtain 4 faces protection tunnel Tunnel will be composed with “modules” nearly a cubic meter long assembled together+ leak cover They will be installed on a base plate. (rectangular plate, some of them have a specific shape for guide supports (cut). This call for tender concerns only section A, C D and F composed with STEEL. Section B and E will be the topics of a future call.

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95