ILL
For radiological reason, a polyethylene tunnel should be placed around a guide.
It is composed with 4 faces machined plates assemble together with screws
Each side has different shape and thickness to fit with existing protections.
The “base plates” are already delivered because they will be installed in the coming weeks. Rest of the tunnel compose this call for tender.
It is composed with PEHD 500 biggest plate is nearly 1 meter x 700 mm – no complex machining
Thickness between 50 and 200 mm