Framework Supply Contract for Secondary Supports for CCWS and TCWS
Opening date
May 24, 2023
Closing date
June 8, 2023
Type
Tender
Research Facility
ITER
In accordance with all the requirements which are specified under the present specification and
which may be clarified and/or modified (if needed) further under each Supply Order, the
Contractor shall execute the following scopes;
1) Production of structural steels,
2) Packing and shipping of structural steels to the designated location(s), and
3) Providing all the required documentations
Regarding 1) above, in case that the Contractor is not steel producer (for example, steel distributor,
steel fabricator, or any other business company), they shall manage their entire supply chain and
ensure the full traceability of products so that the delivered steels shall fully satisfy the IO
requirements.
Regarding 2) above, the designated location(s) will be either at ITER Site at Saint Paul Lez Durance
France or any other place(s) to be instructed by the IO under the relevant Supply Order(s).
The IO will commit actual order(s) to the Contractor only through Supply Order(s), which will be
issued under the conditions of the Framework Contract.
The Contractor shall supply different types of structural steels (such as plates, beams, sections,
angles and so on).
The material shall be either carbon steel or stainless steel.
For any item, the Contractor must be able supply in accordance with ASTM Standard and EN
Standard, while only one of them will be used and specified in BOM for each Supply Order.