F4E-OPE-1174 - Design and manufacturing of Neutral Beam Cryolines, Cryojumpers and Johnston couplings
Opening date
December 15, 2021
Closing date
February 9, 2022
Type
Tender
Research Facility
Fusion for Energy
The scope includes the design, manufacturing, testing and delivery of the 8 cryogenic lines, of 4
vacuum insulated process pipes each, including the 8 connection box to interface with the Johnston
couplings, vacuum connection, vacuum protection, building supports and building penetrations.
Each NB-CP vacuum insulated cryogenic line was preliminary designed in a nominal DN200
diameter and is approximately 25 m long.