F4E-OPE-1174 - Design and manufacturing of Neutral Beam Cryolines, Cryojumpers and Johnston couplings

Opening date

December 15, 2021

Closing date

February 9, 2022

Type

Tender

Research Facility

Fusion for Energy

The scope includes the design, manufacturing, testing and delivery of the 8 cryogenic lines, of 4 vacuum insulated process pipes each, including the 8 connection box to interface with the Johnston couplings, vacuum connection, vacuum protection, building supports and building penetrations. Each NB-CP vacuum insulated cryogenic line was preliminary designed in a nominal DN200 diameter and is approximately 25 m long.