Evaporator
Opening date
February 2, 2023
Closing date
February 27, 2023
Type
Propose suppliers
Research Facility
ESS
An evaporator is to be installed in H09 building (fig.1), dealing with treatment of radioactive waste collected from the ESS site.
Evaporation of at least 1m3 of purified, tritium-containing water to existing stack. Operation 24/5 (five days/week), at least 200 m3/year.