ESS instrument CWL Manifolds
Opening date
March 9, 2026
Closing date
March 30, 2026
Type
Propose suppliers
Research Facility
ESS
The main interfaces for these manifolds are:
• Users of SE utilities and air coolers, such as technicians and SE staff
• Power and signal distribution.
o Components shall be prepared to be connected to a Local control cabinet according to the drawings.
o Local control cabinet is not part of the scope.
• CWL piping system; primary side of the cooling manifold, connected by flanges as described in drawings.
• Pipe connection to user, connected with flanges as per the drawings, instrument spatial integration with user and placing of equipment managed internally ESS.