ESS instrument CWL Manifolds

Opening date

March 9, 2026

Closing date

March 30, 2026

Type

Propose suppliers

Research Facility

ESS

The main interfaces for these manifolds are: • Users of SE utilities and air coolers, such as technicians and SE staff • Power and signal distribution. o Components shall be prepared to be connected to a Local control cabinet according to the drawings. o Local control cabinet is not part of the scope. • CWL piping system; primary side of the cooling manifold, connected by flanges as described in drawings. • Pipe connection to user, connected with flanges as per the drawings, instrument spatial integration with user and placing of equipment managed internally ESS.

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95