DO-32384/EN - Design, supply, installation, testing and commissioning of a skid-mounted demineralized water cooling system for the Power Converter of ALICE Experiment
Opening date
February 21, 2020
Closing date
March 20, 2020
Type
Price Inquiry (DO)
Research Facility
CERN
This technical specification concerns the design, supply, installation, testing
and commissioning of a skid-mounted demineralized water cooling system
for the Power Converter of ALICE experiment. The cooling system will be
located in surface building SX2 of the LHC Point 2 on the French territory.
The contract is expected to be awarded in March 2020. Performance test of
the whole cooling system with heat load and power converter connected is
foreseen in September 2020.
External link to procurement, here