DESIGN AND MANUFACTURE HOT CELL FOR THE RADIO-ISOTOPE PRODUCTION

Opening date

March 11, 2024

Closing date

March 29, 2024

Type

Propose suppliers

Research Facility

ILL

The scope of project is to study, design, manufacture and install on the ILL facilitie a hot cell for the radioisotope production with the equipements need for the manufacturing process. The equipement are :  The hot cell with the safety and security accessories, the fan system, the radioprotection study, adaptation for the transfer castle, and the integration to follow equipements : tools to cut shuttles containing sample, conditionning, handling in the hot cell, the manipulators, ...  The transfer castle allowing to do transfer of shuttles between the reactor (for irradiation) and the hot cell for conditionning.  The transfer castle adaptation in the reactor pool (to put the shuttle after irradiaton in the reactor).  The transfer castle adaptation on the hot cell (to put the shuttle after irradiaton in hot cell).  The container expetidion adaptation on the hot cell (to send the samples after conditionning).  A press to compact waste.  The waste container for the waste created in the hot cell.  The handling devices for the global process from reactor pool to samples expedition in the container.

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95