Communication Cables Supply and Installation Work for the ELT Control Model
Opening date
March 2, 2023
Closing date
March 30, 2023
Type
Forthcoming tender
Research Facility
ESO
Installation of Cat7 and singlemode/multimode fibre cabling and accessories: raw cabling materials, patch panels, cabinets, cable attachment / splicing and endtoend certification . The Contractor shall indicate in the proposal which OLTS/OTDR device (manufacturer/ model) will be used to qualify the fibre cabling and The Contractor shal incl ude a report sample / example . l indicate in the proposal which device (manufacturer/model) will be used to qualify the RJ45/8P8C CAT6A cabling. The Contractor shall include a report / example