CHWS-1B Air Cooled Chillers

Opening date

November 29, 2023

Closing date

January 19, 2024

Type

Market Survey

Research Facility

ITER

The scope of supply shall include one Complete Refrigeration Package. Composed by 3 Identical Air Cooled Chiller Units (Tags: 26CH1B-CHI-1001&1002&1003) installed in parallel (Refer to Appendix A). The chilled water circulation pumps are supplied by others and excluded from this scope of this document. Each Unit shall include all required Mechanical, Electrical and Instrumentation & Control equipment required for its safe and reliable operation under the duty conditions established in Section 4. Each Unit shall be installed on one independent skid along with required seismic isolation devices (to be included in the scope of vendor). Taking into account that pump run at fixed speed and that chilled water flow is equally divided among the 3 units, Supplier should propose as option any additional equipment required to coordinate the repartition of the duty among the 3 Units (e.g. additional control unit).
External link to procurement, here

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95