CFT-003038 (Replacement of the electrical cabinets of the air handling units in the COMMON Building)
Opening date
November 3, 2020
Closing date
November 30, 2020
Type
Forthcoming tender
Research Facility
ESRF
This CFT concerns the replacement of the electrical cabinets of the air-handling units in the “common” building. The main works are : - Dismantling of old electrical cabinets. - Realization of electrical diagrams - Realization a new control-command with Rockwell PLC, speed driver, temperature sensor, speed sensor, hygrometry. - Programming the PLC - Programming of the Building Management System - Final test and commissioning to validate the operating installation during 2021/2022 winter The works will be done in several phases during the technical shutdown and the winter closure of ESRF. The works shall be carried out by a company specialized in electrical and control command HVAC (Heating, Ventilation, Air Conditioning) system. The company shall have an after-sales service in France in order to be able to intervene within 48 hours during the 2-year warranty. Note for the manpower part: companies based outside France are subject to French Law on "Temporary posting of workers in France" (attached)
External link to procurement, here