[516] Framework Agreement for False Floors
Opening date
February 27, 2025
Closing date
March 20, 2025
Type
Tender
Research Facility
ESS
ESS instrument halls extend from the target and accommodate bunker, instrument guides shielding, hutches and caves. Auxiliary equipment that belongs to those instruments such as chopper cooling and control racks, monitoring racks and power cabinets, are placed in-between the beamlines and next to the caves. To be able to route cables and piping along the floor and not prevent accessibility, an elevated floor is required. The scope of work for this framework supply agreement is to provide a number of false floors in the D01, D03, E01 & E02 buildings, from detailed design to installation. ESS intends to sign one (1) framework agreement with one (1) supplier.
External link to procurement, here