[452] Framework Agreement Mechanical Installation Services and Materials
Opening date
February 8, 2024
Closing date
March 6, 2024
Type
Tender
Research Facility
ESS
This appendix lists typical pre-fabrication and installation activities including materials
that could be ordered under the framework agreement. These typical installation
activities are provided as a way of providing a better understanding of the object of this
framework agreement.
Pre-fabrication (off-site), including, but not limited to:
1. Prefabrication of pipe support, primary and secondary;
2. Prefabrication of pipes;
3. Prefabrication of steel structures;
4. Manufacturing of different specific components, e.g. vessels, tank;
5. Facilitate the 3rd party inspections according with AFS/PED if applicable;
6. NDE testing according to ITP;
7. Painting if applicable;
8. Vacuum system;
9. Mechanized welding capability;
10. Machining and cutting capabilities (both SS & CS)
Installation activities (on-site), including, but not limited to:
1. Installation of pipe supports;
2. Installation of piping, various dimensions;
3. Installation of steel structures;
4. Installation of anchors (Hilti, Fisher etc.);
5. Bending pipes;
6. Machining and cutting capabilities (both SS & CS);
7. Vacuum system;
8. Manpower to support other installation companies (In-kind);
9. Mechanized welding capability
Documentation activities, including, but not limited to:
1. Collect and provide installation documentation according to Inspection and Test
Plans;
2. Red-lined as-built drawings;
3. Reporting of non-conformities