[452] Framework Agreement Mechanical Installation Services and Materials

Opening date

February 8, 2024

Closing date

March 6, 2024

Type

Tender

Research Facility

ESS

This appendix lists typical pre-fabrication and installation activities including materials that could be ordered under the framework agreement. These typical installation activities are provided as a way of providing a better understanding of the object of this framework agreement. Pre-fabrication (off-site), including, but not limited to: 1. Prefabrication of pipe support, primary and secondary; 2. Prefabrication of pipes; 3. Prefabrication of steel structures; 4. Manufacturing of different specific components, e.g. vessels, tank; 5. Facilitate the 3rd party inspections according with AFS/PED if applicable; 6. NDE testing according to ITP; 7. Painting if applicable; 8. Vacuum system; 9. Mechanized welding capability; 10. Machining and cutting capabilities (both SS & CS) Installation activities (on-site), including, but not limited to: 1. Installation of pipe supports; 2. Installation of piping, various dimensions; 3. Installation of steel structures; 4. Installation of anchors (Hilti, Fisher etc.); 5. Bending pipes; 6. Machining and cutting capabilities (both SS & CS); 7. Vacuum system; 8. Manpower to support other installation companies (In-kind); 9. Mechanized welding capability Documentation activities, including, but not limited to: 1. Collect and provide installation documentation according to Inspection and Test Plans; 2. Red-lined as-built drawings; 3. Reporting of non-conformities

More information

If you require any further information, feel free to contact me.

Dr Mike Olsson

Business Developer & Project Manager

Industrial Liaison Officer (ILO): ESS, ILL and ESRF • Contact point MAX IV, ISIS

mike.olsson@bigsciencesweden.se

+46 708 30 97 95