[3561] Supply and installation of fume hoods and walk-in fume hoods for chemical laboratory
Opening date
April 23, 2025
Closing date
May 28, 2025
Type
Propose suppliers
Research Facility
ESRF
The present CFT aims at procuring fume hoods and walk-in fume hoods for a large laboratory that will have to deal with chemical and explosive risks due to formalin and ethanol. It requires the delivery and installation of 3 fume hoods of 180cm and 2 of 120cm with a capacity of retention in case of leak, as well as two trashes systems coupled to air extraction. it requires the delivery and installation of 4 walk-in fume hoods of 110*110 cm2 size on the ground, with a vertical aperture of at least 2m. All these devices will be connected to the general laboratory air extraction, and will have to include regulation systems from Trox that will be provided (model DS-TRD-02). All the material would need to be installed and coupled to the air extraction by the 24th of April 2026. Note for the manpower part: companies based outside France are subject to French Law on "Temporary posting of workers in France" (attached)