2023/S 200-626400 Gas-distribution network

Opening date

October 11, 2023

Closing date

November 12, 2023

Type

Tender

Research Facility

FAIR

For the connection of the Branch Box BB of the Super-FRS accelerator system at FAIR to the Cooldown and Warmup Unit CWU about sixty meters of cryogenic and warm gas helium transfer lines have to be designed, produced and installed at the FAIR site. The process headers for the CWU supply (down to 80 K) and return (down to 20 K) are combined inside a DN 400 vacuum insulated main transfer line with a simple shield connected to the return. This main line is always accompanied by a DN 80 non-insulated 300 K helium warm gas supply line, and a DN 80 non-insulated current lead return line. These three parallel lines are called transfer line bundle (TLB).