2022/S 046-118905 pump controllers

Opening date

March 6, 2022

Closing date

April 3, 2022

Type

Tender

The project is currently being built at the GSI complex and is designed to work in conjunction with the existing GSI system. To generate and maintain the operating pressures required in the FAIR and GSI accelerators, NEG (non-evaporable getter) pumps will be used. These pumps were already procured in the framework agreement 33_RV_NEG-pumps_2020. Now the controllers required to operate the pumps will be procured. These controllers are required for different accelerator parts at FAIR,GSI and FZ Jülich (third). Framework agreement - over four years. Maximum scope of 150 pieces.
External link to procurement, here