PERIPHERAL TYRESS2 ESS
Opening date
February 10, 2026
Closing date
March 2, 2026
Type
Propose suppliers
Research Facility
ILL
SKID request:
The TYRESS2 station is composed of 4 main blocs as shown on the P&ID (Process, Piping and Instrumentation Diagram), the MEOP filling station, the SKID (Peripherals), the Laser rack and the outside sub-systems (hydraulic pumping unit
+ LN2 tank).
The ILL will ask for a supplier to design and build the Full SKID (Peripherals), to Integrate the lasers into a rack, to provide Rack2 on the MEOP station, hydraulic external pumping unit and to interconnect all sub-systems.
Main requirements:
• Design and build the skid.
• Make and provide the electrical drawings of the electrical cabinet which is part of the single unit SKID.
• Realize the cabling, inside the SKID and all connections to the sub-systems.
• Integrate the Lasers (provided by ILL) into a single rack.
• Provide Rack2 on the MEOP unit.
• Supply of all materials, components and assemblies required for the skid and associated electrical cabinets according to ILL specifications.
• Complete electrical wiring, pneumatic tubing, gas lines and vacuum connections.
• Full internal testing, functional testing and preparation.
• Packaging, loading, transport to ILL and safe delivery.
• On-site installation at ILL: positioning, alignment and final connections.
• Commissioning, start-up assistance, troubleshooting and optimization