Price Inquiry

Filtering by: Price Inquiry
Apr
2
to May 30

CERN – DO-32034/TE/SPS - Supply of Sixteen (16) Capacitor Banks for the 5kV 2kA SMQ Power Converters Output Passive Filter

CERN – DO-32034/TE/SPS - Supply of Sixteen (16) Capacitor Banks for the 5kV 2kA SMQ Power Converters Output Passive Filter

This Technical Specification concerns the design, manufacture, conformity tests, delivery to CERN and documentation of 16 capacitor banks. The capacitors will be used in 12-pulse thyristor power converters output passive filters.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Apr
9
to May 7

CERN – DO-32028/EP/ATLAS - Supply of DC Low Voltage generators for the ATLAS NSW Upgrade

CERN – DO-32028/EP/ATLAS - Supply of DC Low Voltage generators for the ATLAS NSW Upgrade

This Technical Specification concerns the supply of 38 LV generators, with an output voltage of 300 V d.c., for the ATLAS experiment’s New SmallWheel Upgrade.
The delivery is foreseen over 15 months from notification of the Contract. The first delivery is expected to take place within three months from notification of the Contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →

Mar
4
to Mar 22

CERN – DO-31899/TE/MSC - Supply of REBCO Coated Conductor

CERN – DO-31899/TE/MSC - Supply of REBCO Coated Conductor

This Technical Specification concerns the supply of up to 2040 m of REBCO coated conductor with an engineering critical current density of at least 400 A/mm2 at 4.2 K and 20 T.
Delivery is foreseen over 5 months from notification of the Contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Feb
18
to Mar 18

CERN - DO-31969/EP/ALICE - Supply of Rigid-Flex Printed Circuit Boards for the ALICE Muon Tracker Upgrade

CCERN - DO-31969/EP/ALICE - Supply of Rigid-Flex Printed Circuit Boards for the ALICE Muon Tracker Upgrade

This technical specification concerns the supply of 3270 rigid-flex circuits for the ALICE Muon Tracker upgrade. The supply shall be delivered over three to four months from placement of the order.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Feb
11
to Mar 11

CERN - DO-31931/EN/STI - Manifolds for HL-LHC Collimators

CERN - DO-31931/EN/STI - Manifolds for HL-LHC Collimators

This technical specification concerns the supply of 44 manifolds to be integrated as part of the cooling circuit for collimators. Deliveries are foreseen over 24 weeks from placement of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Jan
15
to Feb 12

CERN - DO-31798/TE/MPE - Supply of Two 2kA Bi-Polar Energy Extraction (EE) Systems based on IGBT elements for Hi-Lumi superconducting magnet test station

CERN - DO-31798/TE/MPE - Supply of Two 2kA Bi-Polar Energy Extraction (EE) Systems based on IGBT elements for Hi-Lumi superconducting magnet test station

This document is a technical specification for the energy extraction systems (EE) which use semi- conductors as DC circuit breakers to commutate a DC current of 2kA into a dump resistor for the purpose of quench protection of Hi-Lumi superconducting magnets. It concerns the production, qualification and delivery of two (2) systems to CERN as part of the in-kind contribution toSweden’s university Uppsala in their FREIA Laboratory. This document describes the functions specify the requirements towards the design of the EE systems.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Jan
15
to Feb 15

CERN - DO-31724/TE - Assembly and Cabling of Process Control Cabinets

CERN - DO-31724/TE - Assembly and Cabling of Process Control Cabinets

This technical specification concerns the wiring of one pre-series and five series of low tension control cabinets for four LHC cryogenic compressor stations (QSCA).
All the equipment and components will be provided by CERN (except consumable material as listed in § 2.2).

The delivery of the pre-series cabinet is required within eight weeks following notification of the contract, while the remaining five cabinets are required to be delivered in three phases: one batch within three weeks after CERN’sacceptance of the pre-series, the second batch within ten weeks after acceptance of the first batch and the third and last batch within ten weeks after acceptance of the second batch.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Dec
19
to Jan 30

CERN - DO-31881/BE/HL-LHC - Supply of Coaxial Feedthroughs for BPMs

CERN - DO-31879/TE/HL-LHC - Supply of HL-LHC CRYOSTAT, Mechanical Pieces for Thermal Shield

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Dec
11
to Jan 9

CERN - DO-31812/EP/CMS - Supply of the Optical Fibre Systems for the CMS Muon Detectors

CERN - DO-31812/EP/CMS - Supply of the Optical Fibre Systems for the CMS Muon Detectors

This technical specification concerns the supply of optical fibre assemblies, adaptors and patch panels for the three CMS muon detectors at CERN: GE1/1, CSC and RPC. The fibres shall be able to operate in the hostile CMS detector environment. Deliveries are foreseen over two months starting in March 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Dec
10
to Jan 21

CERN - DO-31879/TE/HL-LHC - Supply of HL-LHC CRYOSTAT, Mechanical Pieces for Thermal Shield

CERN - DO-31879/TE/HL-LHC - Supply of HL-LHC CRYOSTAT, Mechanical Pieces for Thermal Shield

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
23
to Dec 21

CERN - DO-31852/TE/CRG - Supply of Cryogenic Valves for the Cryogenic Distribution System of B163

CERN - DO-31852/TE/CRG - Supply of Cryogenic Valves for the Cryogenic Distribution System of B163

This technical specification concerns the design, manufacture, supply of the Cryogenic Valves required for the Cryogenic Distribution System of B163. Deliveries are foreseen 3 months from placement of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
23
to Dec 21

CERN - DO-31152/TE/ABT - Auto-ranging Capacitor Charging Power Supplies 330 V - 11 A unit and 660 V - 5.5 A unit with power sink option for the PS complex

CERN - DO-31152/TE/ABT - Auto-ranging Capacitor Charging Power Supplies 330 V - 11 A unit and 660 V - 5.5 A unit with power sink option for the PS complex

This technical specification concerns the design, manufacture, acceptance tests, documentation and delivery to CERN of sixty capacitor charging power supplies in the 3300 W range with power sink option in the 300 W range for the high voltage pulsed generators of the PS complex kicker systems at CERN.

Deliveries are foreseen over 13 months period from placement of the contract. Pre-series delivery is expected 4 weeks after notification of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
22
to Dec 20

CERN - DO-31829/EN/HL-LHC - Supply of radiation-hardness mechanical switches

CERN - DO-31829/EN/HL-LHC - Supply of radiation-hardness mechanical switches

This technical specification concerns the supply and delivery of 1200 radiation-hardness mechanical switches to use for HL-LHC Collimators. Deliveries are foreseen within 12 months from the placement of the contract, being the first partial delivery within 4 months from placement of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
15
to Dec 13

CERN - DO-31790/EP/ATLAS - Supply of Planar Pixel Sensors for the ATLAS ITk

CERN - DO-31790/EP/ATLAS - Supply of Planar Pixel Sensors for the ATLAS ITk

This technical specification concerns the supply of 100m-thick and 150m-thick n-in-p planar pixel sensors with Double Chip (DC), Single

Chip (SC) geometry prototype sensors and, if applicable, quad sensors for the ATLAS Inner Tracker (ITk) upgrade, to be supplied as part of the Step-3 qualification process of the Market Survey MS-4339/EP. Deliveries are foreseen during the first half of 2019.

CERN reserves the right to split the purchase orders amongst several contractors for each lot.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
13
to Dec 11

CERN - DO-31811/TE/HL/LHC - Supply of an Assembly for Chemical Processing of High Luminosity LHC cavities

CERN - DO-31811/TE/HL/LHC - Supply of an Assembly for Chemical Processing of High Luminosity LHC cavities

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
13
to Dec 11

CERN - DO-31794/EN - Supply of PS Beam Stopper Flanges

CERN - DO-31794/EN - Supply of PS Beam Stopper Flanges

This technical specification concerns the supply of 96 flanges for beam stopper in stainless steel forged EN 1.4429 (X2CrNiMoN17-13-3, equivalent to AISI 316LN) for Ultra-High Vacuum applications.
Deliveries are foreseen over seven months from placement of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Nov
7
to Jan 18

CERN - DO-31814/EN/EL - Supply and Installation of 24 kV Solid Insulated Three-Phase Bus Bars

CERN - DO-31814/EN/EL - Supply and Installation of 24 kV Solid Insulated Three-Phase Bus Bars

This technical specification concerns the supply and installation of four sets of solid insulated three-phase bus bars (resin impregnated paper), with a rated voltage of 24 kV, for connections between new switchgears which will be installed in substation ME9, located in building 212 on CERN Meyrin site, Switzerland. Delivery and installation are foreseen in December 2019 / January 2020.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Oct
23
to Nov 20

CERN - DO-31784/TE/MPE - Inductive Load for 2kA Energy Extraction Systems Test Bench

CERN - DO-31784/TE/MPE - Inductive Load for 2kA Energy Extraction Systems Test Bench

This document specifies the technical parameters of an inductive load that is required for the Energy Extraction (EE) systems test facilities at CERN. It describes as well the basic operation of the tests bench, the principle of operation of EE systems and the resulting need for such an inductive load.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Oct
15
to Nov 12

CERN – DO-31764/TE/LIU - Supply of Earth and Configuration Switches for SPS-200 consolidation project

CERN – DO-31764/TE/LIU - Supply of Earth and Configuration Switches for SPS-200 consolidation project

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
11
to Nov 8

CERN – DO-31763/TE/MSC - Design, construction, installation, and commissioning of a 2-axis stage assembly for a rotating-coil scanner

CERN – DO-31763/TE/MSC - Design, construction, installation, and commissioning of a 2-axis stage assembly for a rotating-coil scanner

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
10
to Nov 7

CERN – DO-31716/IT - Supply of XGS-PON network devices

CERN – DO-31716/IT - Supply of XGS-PON network devices

This technical specification concerns the supply of XGS-PON network devices. As this technology has not yet been installed at CERN, the supply is also intended to provide in-depth exposure to the technology and products in view of studying their suitability for large-scale deployment. Therefore, training shall be within the scope of supply.

Deliveries are foreseen over two years from placement of the contract.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Oct
8
to Nov 5

CERN – DO-31753/EN/STI - Supply of vacuum chambers for the TIDVG5 SPS internal dump

CERN – DO-31753/EN/STI - Supply of vacuum chambers for the TIDVG5 SPS internal dump

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Sep
27
to Oct 25

CERN - DO-31661/TE/EPC - Supply of 36 kV Outdoor Current Transformers for Several Static Var Compensator Projects

CERN - DO-31661/TE/EPC - Supply of 36 kV Outdoor Current Transformers for Several Static Var Compensator Projects

This technical specification concerns the supply of up to 250 current transformers 36 kV for outdoor installation, for several Static Var Compensator projects.

The contract will be a five years supply contract, with the possibility to be renewed by CERN for two additional periods of one year. The planned contract start date is October 2018.

The delivery to CERN the first batch of 20 units is planned for 13 February 2019.För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Sep
27
to Oct 25

CERN – DO-31682/TE/VSC - Supply of an inductively coupled plasma optical emission spectrometer

CERN – DO-31682/TE/VSC - Supply of an inductively coupled plasma optical emission spectrometer

This technical specification concerns the purchase of an inductively coupled plasma optical emission spectrometer (ICP-OES) for qualitative, semi-quantitative and quantitative analysis of liquid samples.
This equipment will be in operation at the Chemistry Laboratory of the TE / VSC / SCC Section.

Delivery is expected in December 2018

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Sep
23
to Oct 21

CERN – DO-31643/EP/ATLAS - Supply of a Lifting Tool for the ATLAS New Small Wheel

DO-31643/EP/ATLAS - Supply of a Lifting Tool for the ATLAS New Small Wheel

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Sep
11
to Oct 9

CERN – DO-31710/TE/EPC-SPS-200 - Supply of High-Voltage transducers for the SYRACUSE power converters

CERN – DO-31710/TE/EPC-SPS-200 - Supply of High-Voltage transducers for the SYRACUSE power converters

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →