Market Survey

Filtering by: Market Survey
Feb
23
to Dec 31

CERN - MS-4433/EP Supply of high speed optoelectronic transceivers

CERN - MS-4433/EP Supply of high speed optoelectronic transceivers

Read more

Requirement (Activity Code):
Supply of high speed optoelectronic transceivers based on a CERN design. (03030200)
Description and/or Specific Condition:
CERN intends to place a contract for the supply of approximately 50,000 optoelectronic transceiver modules. The modules consist of radiation hard ASICs and optical components (to be provided by CERN) assembled onto a printed circuit board.
Interested firms shall have experience in Class 3 (IPC) assembly of electronic components onto printed circuit boards with a very high placement accuracy (approximately 2-3 microns).

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Jul
8
to Aug 5

CERN – MS-4526/EP/CMS - Supply of 3D Pixel Sensors for the CMS Inner Tracker

CERN – MS-4526/EP/CMS - Supply of 3D Pixel Sensors for the CMS Inner Tracker

This Technical Description concerns the supply of about 0.6 m2 of high quality radiation tolerant silicon 3D pixel sensors for the CMS Inner Tracker (IT) upgrade. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in February 2021.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →

May
28
to Jun 25

CERN – MS-4513/TE/HL/LHC - Supply of High Precision DCCTs with a Nominal Current of 2 kA

CERN – MS-4513/TE/HL/LHC - Supply of High Precision DCCTs with a Nominal Current of 2 kA

This Technical Description concerns the supply of 76 bipolar voltage output Direct Current Current Transducers (DCCTs) with a nominal current rating of 2 kA and a 12 hour stability of less than 1 part in 106 (ppm). This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q3 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
May
28
to Jun 25

CERN – MS-4514/TE/HL/LHC - Supply of Ultra-High Precision DCCTs in the range of 14 kA to 18 kA

CERN – MS-4514/TE/HL/LHC - Supply of Ultra-High Precision DCCTs in the range of 14 kA to 18 kA

This Technical Description concerns the supply of 32 bipolar voltage output Direct Current Current Transducers (DCCTs) with two nominal current ratings ranging of 14 kA to 18 kA and a 12 hour stability of less than 0.5 parts in 106 (ppm). This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q3 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
May
21
to Jun 18

CERN – MS-4502/EN/CLIC - Supply of Ultrafast High Pulse Energy Laser System

CERN – MS-4502/EN/CLIC - Supply of Ultrafast High Pulse Energy Laser System

This Technical Description concerns the supply of a system for generating ultrafast laser pulses for the CLEAR facility. The system shall provide pulses with at least 2 mJ of energy at near-IR wavelengths, at a pulse repetition rate of at least 10 Hz, and a variable pulse duration from 300 fs - 2 ps. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q2 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
May
6
to Jun 3

CERN – MS-4525/TE/FRASER - Supply of Samarium Cobalt permanent magnet blocks

CERN – MS-4525/TE/FRASER - Supply of Samarium Cobalt permanent magnet blocks

This Technical Description concerns the supply of Samarium permanent magnet blocks for the FASER dipole magnets. This Market Survey will be followed by a Price Enquiry that is planned to be issued in June 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
May
3
to Jun 3

CERN – MS-4497/EN - Supply of Interrogator Units

CERN – MS-4497/EN - Supply of Interrogator Units

This Technical Description concerns the supply of nine interrogator units consisting mainly of a dual wavelength single-mode Optical Time Domain Reflectometers / Raman Distributed Temperature Sensors module and of an optical switch module. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q2 of 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Apr
23
to May 21

CERN – MS-4500/TE/HL/LHC - Supply of High Precision Digitisers

CERN – MS-4500/TE/HL/LHC - Supply of High Precision Digitisers

This Technical Description concerns the supply of high-resolution digitisers for the surveillance and monitoring of 752 channels within the LHC Beam Dumping System (LBDS) high voltage extraction and dilution kicker generators. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q2-2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Dec
20
to Jan 31

CERN – MS-4481/EP/CMS - Supply of Planar Pixel Sensors for CMS Inner Tracker

CERN – MS-4481/EP/CMS - Supply of Planar Pixel Sensors for CMS Inner Tracker

This Market Survey Technical Description concerns the supply of high quality radiation tolerant silicon planar pixel sensors for the CMS Inner Tracker upgrade.
CERN will purchase “standard” planar sensors, and possibly “slim-edge”sensors if it is deemed in the interest of the project. In this respect, interested firms may be qualified for each type of sensor or a combination of the two. This Market Survey will be followed by an Invitation to Tender to qualified and selected firms that is planned to be issued around March 2020 for a contract to be awarded in the third quarter of 2020.

CERN will reserve the right to split the future contract amongst at least two contractors for the Invitation to Tender.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Nov
20
to Jan 15

CERN – MS-4428/SMB - Supply of semi-finished products in aluminium and aluminium alloys

CERN – MS-4428/SMB - Supply of semi-finished products in aluminium and aluminium alloys

TThis Technical Description concerns the supply of 180 tons of semi-finished products in aluminium and aluminium alloys.
This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q1/2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Nov
16
to Dec 14

CERN – MS-4291/TE/HL/LHC - Supply of Tungsten Shielding Elements for HL-LHC Beam Screens

CERN – MS-4291/TE/HL/LHC - Supply of Tungsten Shielding Elements for HL-LHC Beam Screens

This Technical Description concerns the supply of tungsten shielding elements for HL-LHC beam screens.
This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q1 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Nov
5
to Dec 3

CERN – MS-4493/IT

CERN – MS-4493/IT - Framework Market Survey concerning the Servers and Storage for Physics Data Processing, Acquisition and Control Systems

The technical description concerns the supply of Servers and Storage for Physics Data Processing, Acquisition and Control systemsThe Market Survey will be followed by several invitations to tender planned to be issued during 2019, the first invitation to tender is planned to be issued in February 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Nov
2
to Nov 30

CERN – MS-4483/TE - Supply of Five 12 m (40 ft) Long Modified Shipping Containers for the Housing of the POPS Electric Capacitors

CERN – MS-4483/TE - Supply of Five 12 m (40 ft) Long Modified Shipping Containers for the Housing of the POPS Electric Capacitors

This Technical Description concerns the supply of five identical 12 m (40 ft) long containers for the housing of 15 tonnes of electric capacitors installed in four chassis per container. The containers shall be mechanically modified as described in this technical description. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in February 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
22
to Nov 19

CERN – MS-4475/BE/LINAC3 - Supply of 101 MHz Pulsed 350 kW Solid-State RF Amplifiers for Linac3

CERN – MS-4475/BE/LINAC3 - Supply of 101 MHz Pulsed 350 kW Solid-State RF Amplifiers for Linac3

This technical description concerns the supply of a Demonstrator and two 101 MHz pulsed 350 kW solid-state RF amplifiers for RFQ and IH-DTL Tank1 cavities of the Linac3 accelerator.
This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q4 2018.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
11
to Nov 8

CERN - MS-4486/TE/HL/LHC : Supply of Metal Bellows Expansion Joints for the High Luminosity LHC Cryomagnets

CERN - MS-4486/TE/HL/LHC : Supply of Metal Bellows Expansion Joints for the High Luminosity LHC Cryomagnets

This Technical Description concerns the supply of 600 metal bellows expansion joints of internal diameters between 40 mm and 120 mm for connecting the hydraulic circuits of the High Luminosity LHC superconducting magnets.

This Market Survey will be followed by an Invitation to Tender that is planned to be issued in December 2018.

The delivery to CERN the first batch of 20 units is planned for 13 February 2019.För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

 

View Event →
Oct
10
to Nov 7

CERN – MS-4469/EN - Supply of System Interconnections and Industrial Wiring

CERN – MS-4469/EN - Supply of System Interconnections and Industrial Wiring

This Technical Description concerns the supply of system interconnections and industrial wiring.
This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q4 of 2018.

CERN foresees to place a three years blanket purchase contract with the possibility to be renewed by CERN for two additional periods of one year.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
10
to Nov 7

CERN – MS-4340/EP - Hybridization of Pixel Detector Modules for the ATLAS and CMS Inner Trackers

CERN – MS-4445/EN - Design, Supply, Installation, Testing and Commissioning of a Demineralised Water Production Plant

This framework Market Survey concerns the supply of about 15 000 high quality hybrid pixel detector modules for the ATLAS Inner Tracker (ITk) and about 5 600 of such modules for the CMS Inner Tracker (IT).
It will be followed by the issue of several Invitations to Tender to qualified and selected firms or groups of firms.

The ATLAS Invitation to Tender to be conducted by CERN will be issued in the first quarter of 2020 for a contract to be awarded in the second quarter of 2020.
The Invitation to Tender for CMS to be conducted by CERN will be issued in the last quarter of 2020 for a contract to be awarded in the beginning of 2021.

CERN may split the total requirements of each Invitation to Tender into two or more contracts.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Oct
1
to Oct 29

CERN – MS-4445/EN - Design, Supply, Installation, Testing and Commissioning of a Demineralised Water Production Plant

CERN – MS-4445/EN - Design, Supply, Installation, Testing and Commissioning of a Demineralised Water Production Plant

This Technical Description concerns the design, supply, installation, testing and commissioning of a demineralised water production plant.
This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q1 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Sep
3
to Oct 15

CERN – MS-4439/SMB - Provision of Registration Services, Access Cards Office, Locks and Keys Services and Dosimetry at CERN

CERN – MS-4439/SMB - Provision of Registration Services, Access Cards Office, Locks and Keys Services and Dosimetry at CERN

This technical description concerns the provision of registration services, access cards office, locks and keys services and dosimetry at CERN.

The present market survey will be followed by the issue of an invitation to tender to qualified firms and group of firms in February 2019 for a contract to start on 1st August 2019. The future invitation to tender will be adjudicated on a best value for money basis.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

View Event →
Aug
28
to Sep 25

CERN – MS-4467/TE/HL/LHC - Supply of Energy Storage Systems for the HL-LHC Two-Quadrant 18 kA Power Converters

CERN – MS-4467/TE/HL/LHC - Supply of Energy Storage Systems for the HL-LHC Two-Quadrant 18 kA Power Converters

Energy Storage Systems (ESS) that consist of 52 Lithium Titanate Oxide (LTO) battery modules, including dedicated Battery Management Systems (BMS). This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q1 of 2019.

För mer information om denna upphandling, kontakta oss.

Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
KLICKA PÅ LÄNKARNA HÄR UNDER:

    View Event →
    Aug
    6
    to Sep 5

    F4E-OMF-0882 - Market Consultation

    F4E-OMF-0882 - Market Consultation

    F4E is currently looking to set up cooperation with a set of companies offering nuclear analysis services.

    Nuclear support services requested by F4E in this context will support the engineering design and qualification of components and systems, plant operation, licensing and safety case of ITER.

    Read more

    VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
    KLICKA PÅ LÄNKARNA HÄR UNDER:

    View Event →
    Aug
    6
    to Sep 3

    CERN – MS-4434/TE - Overhaul of the STAL® helium screw compressors during LS2

    CERN – MS-4434/TE - Overhaul of the STAL® helium screw compressors during LS2

    This Technical Description concerns the overhaul of 30 STAL® helium screw compressors of the LHC helium refrigerators.
    This Market Survey will be followed by an Invitation to Tender that is planned to be issued in fourth quarter of 2018.

    För mer information om denna upphandling, kontakta oss.

    Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

    VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
    KLICKA PÅ LÄNKARNA HÄR UNDER:

      View Event →
      Jul
      24
      to Sep 21

      CERN – DO-31516/EN/CV - PJ228 Meyrin S5 control system upgrade B378 Regeneration circuit ED56 and LINAC3 Cooling Station

      CERN – DO-31516/EN/CV - PJ228 Meyrin S5 control system upgrade B378 Regeneration circuit ED56 and LINAC3 Cooling Station

      För mer information om denna upphandling, kontakta oss.

      Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

      VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
      KLICKA PÅ LÄNKARNA HÄR UNDER:

      View Event →
      Jul
      19
      to Sep 7

      CERN — MS-4458/SMB - Supply of Flexible Low Voltage Multicore Copper Cables

      CERN — MS-4458/SMB - Supply of Flexible Low Voltage Multicore Copper Cables

      This technical specification concerns the supply of approx.700 km of Low Voltage Multicore Copper Cables for general purpose electrical installations and data transmission at CERN. Deliveries are foreseen over 3 years from placement of the contract.

      The cables are mainly intended for indoor installations on metallic cable trays, but open-air installations cannot be excluded. They are intended for use in a radiation environment (up to 1 MGy). The cables shall be flame retardant or fire resistant.

      This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q4/2018.

      För mer information om denna upphandling, kontakta oss.

      Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

      VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
      KLICKA PÅ LÄNKARNA HÄR UNDER:

        View Event →
        Jul
        13
        to Aug 10

        CERN – MS-4421/TE/HL-LHC - Supply of Ti6Al4V Rings and Springs for HL-LHC Shielded Beam Screens

        CERN – MS-4421/TE/HL-LHC - Supply of Ti6Al4V Rings and Springs for HL-LHC Shielded Beam Screens

        This Technical Description concerns the supply of around 1’900 Ti6Al4V rings and 14’000 springs for HL-LHC shielded beam screens. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q4 2018.För mer information om denna upphandling, kontakta oss.

        Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

        VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
        KLICKA PÅ LÄNKARNA HÄR UNDER:

          View Event →
          Jul
          10
          to Aug 8

          CERN – MS-4419/EN - Supply, Installation and Commissioning of a High-precision Multi-axis Turning/Milling Machine Centre

          CERN – MS-4419/EN - Supply, Installation and Commissioning of a High-precision Multi-axis Turning/Milling Machine Centre

          This Technical Description concerns the design, manufacture, assembly, configuration, testing, installation, commissioning at CERN of a High- precision Multi-axis Turning/Milling Machine Centre, training of CERN personnel, as well as preventive and corrective maintenance during the warranty period.

          The Market Survey will be followed by an Invitation to Tender that will be issued in the third quarter of 2018 for a contract that will be awarded in the first quarter of 2019. The High-precision Multi-axis Turning/Milling Machine Centre shall be commissioned by the end of 2019.

          För mer information om denna upphandling, kontakta oss.

          Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

          VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
          KLICKA PÅ LÄNKARNA HÄR UNDER:

            View Event →
            Jul
            10
            to Aug 7

            CERN — MS-4449/TE/CLIC - Supply of a Medium Voltage Pulse Forming System for Klystron Modulators

            CERN — MS-4449/TE/CLIC - Supply of a Medium Voltage Pulse Forming System for Klystron Modulators 

            This Technical Description concerns the supply of one Pulse Forming System (PFS) for klystron modulators. This Market Survey will be followed by an Invitation to Tender that is planned to be issued in Q3 2018.

            För mer information om denna upphandling, kontakta oss.

            Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

            VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
            KLICKA PÅ LÄNKARNA HÄR UNDER:

              View Event →
              Jun
              20
              to Jul 18

              CERN – MS-4465/SMB - Civil engineering works for replacement of building 196 on the French part of CERN's Meyrin site

              CERN – MS-4465/SMB - Civil engineering works for replacement of building 196 on the French part of CERN's Meyrin site

              För mer information om denna upphandling, kontakta oss.

              Första steget att leverera till Cern, anmäl dig i Cerns leverantörsdatabas.

              VILL DU VETA MER OM LIKNANDE UPPHANDLINGAR,
              KLICKA PÅ LÄNKARNA HÄR UNDER:

                View Event →